Grid capacity assessment
What the connection can carry today, and what more would take, worked through with the distribution network operator (DNO).
Electrifying a fleet or a site usually runs into the grid connection first. Ovia Group works out what the connection can carry, what a battery adds, and who needs to be at the table to build it.
What the connection can carry today, and what more would take, worked through with the distribution network operator (DNO).
A battery sized to the site, with revenue from peak reduction, flexibility services and trading tested against published market benchmarks.
Demand, power and layout for depots, logistics parks and strategic sites, from rapid charging to HGV scale.
On-site solar PV paired with battery storage where the site suits it.
The landowner, network operator and delivery partners brought into one deliverable project.
On larger sites Ovia Group acts as arranger. We find the site, test the grid, shape the commercial structure and bring the right parties together. Each project is built to be owned and operated for the long term.
Land or grid headroom that could host storage or charging.
Sites where the connection cannot supply the charging the fleet needs.
Estates and strategic sites where storage or charging supports wider plans.
Installers, manufacturers and operators looking for well-prepared projects.
Every site and every discussion is treated in confidence.